Skip to main content

News

All

Announcements

  • DB.CAB.16 Referenced Underground Cable Project Construction Work Auction is Announced. More

    25.10.2018
  • DB.CAB.15 Referenced Underground Cable Project Construction Work Auction is Announced. More

    01.06.2018
  • Capacity Allocation Table Within The Scope of The Regulation on The Production of Unlicensed Electricity in El… More

    15.05.2018
All

Events

  • 3 December International Day of Persons with Disabilities More

    06.12.2018
  • Load Dispatch team became the champion in the 2018 Inter-Unit Football Tournament organized by our General Dir… More

    23.11.2018
  • Children Football Tournament Final and Closing Ceremony took place on grass field behind social facilities loc… More

    22.06.2018
All

Electricity Transmission in Turkey

Energy Transmission Line66.285 KMEnergy Transmission Line (by the end of 2017)
Installed Capacity88.347,2 MWInstalled Capacity (by the end of November 2018)
Electric Energy Generation251.0 TWhAnnual Electric Energy Generation (by the end of October 2018)
Electric Energy Consumption250.8 TWhAnnual Electric Energy Consumption (by the end of October 2018)
Imports2.0 TWhImports (by the end of October 2018)
Exports2.3 TWhExports (by the end of October 2018)

REGIONAL UNITS

LOAD DISPATCH OPERATIONAL DIRECTORIES

REGIONAL DIRECTORIES

  • Milli Yük Tevzi İşletme Müdürlüğü (Çankaya/Ankara)
  • Orta Anadolu Yük Tevzi İşletme Müdürlüğü (Gölbaşı/Ankara)
  • Kuzeybatı Anadolu Yük Tevzi İşletme Müdürlüğü (Adapazarı)
  • Batı Anadolu Yük Tevzi İşletme Müdürlüğü (İzmir)
  • Orta Karadeniz Yük Tevzi İşletme Müdürlüğü (Samsun)
  • Güneydoğu Anadolu Yük Tevzi İşletme Müdürlüğü (Elazığ)
  • Trakya Yük Tevzi İşletme Müdürlüğü (İstanbul)
  • Doğu Anadolu Yük Tevzi İşletme Müdürlüğü (Erzurum)
  • Doğu Akdeniz Yük Tevzi İşletme Müdürlüğü (Adana)
  • Batı Akdeniz Yük Tevzi İşletme Müdürlüğü (Antalya)